
Fiber-cement and asbestos-cement sheet production line
- Bureau part number
- TMN-XHB-01
A full-cycle process line: raw material preparation, grinding, paper stock preparation, cleaning, mixing, sheet forming, pressing, autoclave curing and finishing. Forming follows the Hatschek process. Sheet thickness is set by an electronic gauge, and the slurry-to-water ratio is adjusted automatically against the actual thickness of the blank. Control is by two touch panels and PLCs; the plant has supplied lines with a Russian-language operator interface. From raw material dosing to stacking the line is run by four operators. The plant takes on the whole project: design, manufacturing, delivery, installation, commissioning and process support.
- Brand
- Xinhuibo
- Category
- Turnkey line
- Industry
- Asbestos and fiber cement
- Availability
- Project supply
Specifications
- Forming
- HATSCHEK
- Sheet format
- 2440×1220 mm
- Stacking cycle
- 12–15 с
- Blank moisture
- 27–35%
- Autoclave
- 0.8–1.1 MPa · 12–20 h
- Operators per line
- 4
- Control
- PLC · 2 сенсорные панели
- Equipment
- SIEMENS · SCHNEIDER · ABB · OMRON
- 01
We find
The manufacturing factory, by part number, drawing or a photo of the unit.
- 02
We agree
Price, tolerances, warranty and terms — in writing, before production.
- 03
We inspect
The lot at the factory before shipment. The report and photographs come to you.
- 04
We deliver
By air, rail or road — the route follows the value of the lot and how urgently it is needed.
- 05
We coordinate
Supervised installation and start-up are carried out by the manufacturing plant. We arrange the visit of its engineers, translation and site access.