Documentation in Chinese: what to translate first

You do not need to translate everything at once. First come the documents without which it is dangerous to operate and impossible to repair: safety instructions, electrical and hydraulic diagrams, the lubrication and maintenance chart, the spare parts list, the operator panel texts and the fault codes. A technical translator translates, and an engineer who knows the machine checks.

Updated 4 min read

In short

4minutes to read

6sections

3sources

2catalog items

In this article

  1. 01Translation queue
  2. 02What to ask the plant for before translation
  3. 03Who translates
  4. 04How to check a technical translation
  5. 05Where translation happens by itself
TableTranslation queue8 rows →
Contents
  1. Translation queue
  2. What to ask the plant for before translation
  3. Who translates
  4. How to check a technical translation
  5. Where translation happens by itself
  6. How we do it

The Chinese documentation for a line runs to hundreds of pages, and there is no point in translating all of it at once. First translate the documents without which it is dangerous to operate and impossible to repair: the safety requirements, the electrical, hydraulic and pneumatic diagrams, the lubrication chart and the maintenance schedule, the list of spare and wearing parts, the operator panel texts and the list of fault messages. The rest comes as needed. The translation is done by someone who knows technical vocabulary, and checked by the chief mechanic or the chief power engineer, who compare it with the machine itself. Which documents the law requires in the state language is covered in the article on the passport and the manual.

Translation queue

PriorityDocumentWhy first
1Safety requirements, interlocks, emergency stop procedurepeople depend on them; needed before start-up
1Operator panel screen texts and the list of faultsthe operator sees them every shift
1Electrical diagram, hydraulic and pneumatic diagramwithout them a fault cannot be found
2Lubrication chart and maintenance schedulewhat to lubricate and replace, with what and when
2Spare parts list with numbers from the plant's catalogspare parts are ordered from it
2Procedure for start-up, adjustment and format changeneeded during supervised installation and training
3Full operating manualfor training and reference
3General arrangement drawings, passports of bought-in unitson request, during repair

The passports of bought-in units (motors, gearboxes, pumps, frequency converters) are often available in English from their manufacturer. They are not translated from Chinese but downloaded in the original by the model from the nameplate.

What to ask the plant for before translation

  • Editable files, not scans: texts in Word, diagrams in a CAD format or at least a vector PDF. Translating a scanned image takes longer and brings errors.
  • The language file of the operator panel. Many panels allow a second language to be loaded. If the plant provides a table of texts, it is translated and loaded back, and the operator sees the screen in Russian.
  • The English version, if there is one. Comparing three texts catches errors better.
  • A list of abbreviations and symbols used on the diagrams.

This is worth writing into the contract: the set of documents, the language, the format, who is responsible for the translation and who for its accuracy.

Who translates

It is best to use a technical translator who has already translated industrial equipment, together with an engineer who knows the machine. A general translator or an unchecked machine translation produces typical errors:

  • the same unit name is translated differently on different pages;
  • the designations on the diagram are "translated" and no longer match the marking in the cabinet;
  • units and numbers are changed in translation;
  • 正 and 反 (forward and reverse stroke), 开 and 关 (on and off) are mixed up where the error is dangerous.

A machine translation is fine as a draft, to understand what a page is about. For safety instructions and diagrams a person checks it.

How to check a technical translation

  1. A glossary before starting. A list of the names of units, parts and signals in three languages, one for the whole line. The translator uses only that.
  2. Designations are not translated. Item numbers, signal codes, terminal and wire numbers stay as in the original.
  3. Comparison with the machine. The engineer goes through the diagram at the cabinet: the numbers and names match the marking.
  4. Comparison of numbers. All pressures, torques, clearances and oil volumes are checked against the original line by line.
  5. A test on people. The operator and the mechanic read the translation on site: is it clear what to do.

Where translation happens by itself

Supervised installation and training are the best time to translate live questions. The plant's engineer shows a unit, the translator records the terms, and the mechanic writes them into the glossary at once. The notes from those days are worth more than a translation of a book made without the machine in front of you.

How we do it

  • We agree the set of documents, the language and the format with the plant in writing, before production.
  • Supervised installation and commissioning are carried out by the manufacturing plant. We arrange the visit of its engineers, interpreting and site access.
  • Where the plant's answer is needed, we ask it and pass on its word to you, not our own guess.

What this article relies on

Below are the documents and materials we refer to, so that you can check what is said for yourself.

Standards and documents

  • IEC/IEEE 82079-1:2019 Preparation of information for use (instructions for use) of products (description on the SIS site)text ↗
  • ISO 17100:2015 Translation services — Requirements for translation services (standard card)text ↗

Reference materials

  • ISO 20607:2019 Safety of machinery — Instruction handbook (description on the SIS site)sis.se ↗

The legal requirements for the language of documents are not retold here: they differ for different kinds of equipment and change.

Related catalog items

  • 001Fiber-cement and asbestos-cement sheet production line

    Fiber-cement and asbestos-cement sheet production line

    TMN-XHB-01Xinhuibo

  • 002PLC-based line automation system

    PLC-based line automation system

    TMN-XHB-09Xinhuibo

For slate plants

Felts, meshes and units for your line

We select from manufacturing plants in China by nameplate photo and machine dimensions. Send a photo of the plate and we will tell you what can be ordered.

Request

Ask about your machine

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.

Up to 3 files: photos (JPG, PNG, WEBP, HEIC) or PDF, up to 15 MB in total

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.