Slate line capacity: why sellers quote different figures
Different sellers state line capacity in different units: tonnes per hour, square metres, sheets per shift, conventional sheets. And they calculate it differently: at the machine's top speed, with no stoppages and no rejects. To compare quotations, ask each seller to convert output into your sheets and your shifts and to state what is built into the calculation.
In short
4minutes to read
5sections
5sources
3catalog items
In this article
The same line from two sellers can look twice as powerful or twice as weak, and neither will be lying. One counts in tonnes of slurry per hour, another in square metres of sheet, a third in sheets per shift at the machine's top speed, with no stops for changing the felt and no rejects. Such figures cannot be compared directly. The solution is simple: ask each seller to convert output into your sheet (profile, size, thickness) and your shifts, and to list in writing what is built into the calculation.
What units are used
- Tonnes per hour. Equipment suppliers often write it this way: it is the output of dry slurry or of finished material. Tonnes do not tell you how many sheets you will get: the thicker the sheet, the fewer the sheets.
- Square metres. Convenient for flat sheet. For corrugated sheet you need to clarify whether the area is counted on the developed surface or on the roof coverage.
- Sheets per shift or per year. Clear to the buyer, but it depends on the sheet size and on how many hours per shift the machine really forms.
- Conventional sheets and tiles. In Soviet statistics slate output was counted in conventional tiles of 40 × 40 cm format, so that different products could be added together. If the seller or the old documentation of the line writes "conventional sheets", ask what size and thickness the conversion goes to. The current interstate standard for corrugated sheets has no such concept.
What real output depends on
Machine width and format
The width of the felt and of the format drum sets the width of the blank. How many sheets are cut from one blank depends on your format and on how much goes to trimming at the edges.
Felt speed
The faster the felt runs, the more layers per minute. But speed is limited: the slurry must have time to give up its water, and the layer must build up evenly. At high speed the fiber is stretched more along the machine, and the sheet becomes weaker across it. So the nameplate top speed and the working speed on your slurry are different numbers.
Number of layers and thickness
The sheet is built on the format drum from thin layers. The thicker the sheet, the more drum revolutions per blank and the fewer blanks per hour. If the seller calculated output for a thin sheet and you will make a thick one, output will be lower.
Downtime
In a real shift the machine stands: felt change and washing, screen replacement, changeover to another format, slurry stoppages, planned repair. The seller usually counts "clean" time. Your own real running time is visible from the failure log and the shift sheets.
Rejects and the bottleneck
The line's output is the output of its slowest stage: the forming machine may keep up while the press, the curing chambers, the autoclave or the demoulding do not. And you must count good sheets: rejects and mis-sorting are subtracted from output.
What to ask the seller
- For which sheet (profile, size, thickness) the output is stated.
- At what felt speed and on what slurry (with asbestos or without, with sand or without).
- How many machine running hours per shift are built in, and whether felt changes, washing and changeovers are counted.
- Whether rejects and trimming are counted.
- Which stage limits output: machine, press, curing, autoclave.
- What output has been confirmed on this plant's running lines, and whether shift reports can be seen.
Ask for the answers in writing: they will be useful in the technical specification and at acceptance of the line.
Engineering layer: how to check the figure yourself
A technologist can roughly recalculate output alone: blank width, working felt speed, how many drum revolutions the sheet thickness needs, how many sheets come out of a blank, hours of clean running per shift, share of rejects. Where even one value is taken "at the maximum", the result is overstated. The speed and slurry concentration at which the line gives even thickness are, for your line, set by the process regulations and by the experience of the first weeks of work.
How we do it
- Where the answer must come from the plant (output for your sheet, scope of supply), we ask it and pass on its words.
- What we find, with photos and specifications, we send before the order.
What this article relies on
Below are the documents and materials we refer to, so that you can check what is said for yourself.
Standards and documents
- GOST 30340-2012 "Corrugated chrysotile-cement sheets. Specifications": profiles and sheet sizes, lot and quality document; the standard has no concept of a conventional sheettext ↗
Reference materials
- Great Soviet Encyclopedia, article "Asbestos-cement products" (electronic copy at booksite.ru): sheet product output in the USSR is given in conventional tiles converted to a 40 × 40 cm sizebooksite.ru ↗
- European patent application EP 2687346: fiber cement sheet line capacity is stated in tonnes per hourdata.epo.org ↗
- Patent application US 2016/0052163 "A Hatschek process for the production of fiber cement plates": at higher machine speed the fiber is oriented more along the machinepatents.justia.com ↗
- Rybyev I. A. "Building Materials Science" (Строительное материаловедение), section "Fundamentals of asbestos-cement product manufacturing": machine output depends on speed, slurry concentration and the state of the feltstudme.org ↗
The output of a specific line on your sheet and your slurry is stated by the manufacturing plant; the figures in this article are a way to compare them, not a norm.