The process regulations are the plant's main technical document: which raw materials, which recipe, which modes at each stage, what to check and how often, which tolerances and what to do on a deviation. The GOSTs for corrugated and flat sheets require them to be made according to regulations approved by the plant. The chief process engineer maintains them; they are revised when raw materials, equipment or products change.

Updated 5 min read

In short

5minutes to read

6sections

5sources

2catalog items

In this article

  1. 01What the owner needs to decide
  2. 02What the regulations consist of
  3. 03Stages and what to record for each
  4. 04Control: what to tie to the GOST
  5. 05How to maintain and revise
TableWhat the regulations consist of13 rows →
Contents
  1. What the owner needs to decide
  2. What the regulations consist of
  3. Stages and what to record for each
  4. Control: what to tie to the GOST
  5. How to maintain and revise
  6. How we do it

The process regulations are the document by which a plant makes a sheet: from what, in what proportion, in what order, at what modes and with what control. GOST 30340-2012 for corrugated sheets directly requires them to be made according to process regulations approved by the manufacturing plant; GOST 18124-2012 for flat sheets has the same requirement. The regulations are not for inspectors: without them each shift works "as it is used to", and the cause of a defect has nothing to be compared with. Below is what they must contain for a Hatschek line and how to maintain them.

What the owner needs to decide

  • Does the plant have valid regulations, and do they match the line that stands now? After modernization, a change of raw materials or a new product, the old regulations often describe a different plant.
  • Who is responsible for the regulations. Usually the chief process engineer; the head of the enterprise approves.
  • Check the requirements of your country for the form and approval of process documentation against its current norms: this article does not cover them.

What the regulations consist of

There is no single form for slate plants in open sources. It is convenient to take as a basis the set of sections accepted in industry rules on process regulations and fill it with your own process.

SectionWhat to write for a slate plant
General description of productionline, capacity, types and sizes of sheets
Productsprofiles, thicknesses, coloring; which GOST or TU they are made to
Raw materials and suppliescement, fibre, sand or ground filler, additives, paint, water; requirements for each and incoming control
Recipeslurry composition for each kind of sheet; how to adjust when the raw material lot changes
Description of the process by stagesfrom fibre preparation to the finished goods store, with a line diagram
Modeswhat is set at each stage and within what limits
Consumption norms for raw materials and energyper unit of product
Waste and its returntrimmings, sludge, broken sheets; what is returned to the slurry and how
Production controlwhat, where, how often, by whom and with what instrument it is checked; logs
Possible faults and actionssign, cause, what to do, who decides
Safety and environmental protectionper the norms of your country
List of instructionswork instructions for operators, setters, the laboratory
Equipment specificationmachines and main units with passport data

Stages and what to record for each

  1. Fibre preparation. Opening or pulping and refining of cellulose: equipment, loading order, how the degree of opening or refining is controlled.
  2. Slurry preparation. Order and time of loading the components, concentration in the agitator and in the vats, how it is measured.
  3. Forming. Machine speed, number of format drum turns per sheet, thickness of the green sheet, vacuum by box, washing of felt and screens.
  4. Cutting, corrugating, press. Dimensions of the green sheet, tolerances, press mode for a flat sheet.
  5. Precuring. Temperature, humidity and time in the chambers; when demolding is allowed.
  6. Demolding, autoclave or air curing. Autoclave mode or conditions of maturing in the store.
  7. Coloring (if any). Surface preparation, consumption, drying.
  8. Storage and acceptance. Stacking, holding before shipment, forming a lot, marking.

The modes themselves, in figures, are taken from the line passport, from trials on your raw materials and from sheet tests. The regulations record them as a range and say what to do when it is exceeded.

Control: what to tie to the GOST

The control section is built so that it leads to the tests of the finished sheet under the GOST. The standard divides them into two groups:

  • for every lot: appearance, dimensions and shape, load, density, and for colored sheets, coating durability;
  • periodically: bending strength, impact strength, frost resistance, water impermeability.

A lot under the GOST is sheets of one type made by one technology from the same materials, in the volume of the line's shift output. So it is useful to record in the regulations how a lot gets its number and how this number is tied to the shift logs: then from a defect in a lot you can find what happened with the slurry and the machine in that shift.

How to maintain and revise

  • Approved by the head of the enterprise, maintained by the chief process engineer.
  • Changes are made in the same way as the regulations themselves and recorded in a change sheet. Handwritten corrections in the working copy are bad practice.
  • Revised when the raw materials or the supplier of cement and fibre change, equipment is replaced, a new product is launched, or defects repeat. In industry rules the period of validity of the regulations is limited, and validity is confirmed by an order; this is a good habit for a slate plant too.
  • Temporary regulations are written for the start-up of a new line or a new technology and replaced by permanent ones after it is mastered.
  • Making products under unapproved or outdated regulations is forbidden by industry rules.

How we do it

  • From the number, drawing or photo of the unit, we look for the item at the manufacturing plant. What we find, with the price, photos and specifications, we send before the order.
  • The line automation system and separate slurry preparation units can be asked for separately or as part of a line from the catalog.

What this article relies on

Below are the documents and materials we refer to, so that you can check what is said for yourself.

Standards and documents

  • GOST 30340-2012 "Chrysotile-cement corrugated sheets. Specifications": manufacture according to process regulations (clause 5.1), lot, acceptance and periodic teststext ↗
  • GOST 18124-2012 "Chrysotile-cement flat sheets. Specifications"text ↗
  • Regulation on process regulations for production at chemical complex enterprises (Ministry of Economy of Russia, 2000): sections of the regulations, types, approval, changestext ↗

Reference materials

  • "Production process regulations: what is it?" (fb.ru): general set of sections of the regulationsfb.ru ↗
  • Rybyev I. A. "Building Materials Science" (Строительное материаловедение), section "Fundamentals of asbestos-cement product manufacturing": stages of sheet productionstudme.org ↗

The 2000 regulation was written for the chemical industry of Russia and is given as a sample of structure; the requirements for regulations in Uzbekistan, Kazakhstan, Kyrgyzstan and Tajikistan are not covered in the article.

Related catalog items

  • 001Fiber-cement and asbestos-cement sheet production line

    Fiber-cement and asbestos-cement sheet production line

    TMN-XHB-01Xinhuibo

  • 002PLC-based line automation system

    PLC-based line automation system

    TMN-XHB-09Xinhuibo

For slate plants

Felts, meshes and units for your line

We select from manufacturing plants in China by nameplate photo and machine dimensions. Send a photo of the plate and we will tell you what can be ordered.

Request

Ask about your machine

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.

Up to 3 files: photos (JPG, PNG, WEBP, HEIC) or PDF, up to 15 MB in total

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.