Industrial supply bureau · Tashkent
We find the factory. Inspect the lot. Deliver to your warehouse.
Spare parts and equipment from factories in China — straight from the makers. Inspection before shipment: failed — not shipped.
Process
Four steps from part number to warehouse
Source
The manufacturing factory for your part number, drawing or photo.
Negotiate
Unit and volume price, production time, our recommendation.
Inspect
Measurement, material, marking, lot number. Failed — not shipped.
Deliver
To your warehouse. Status updates — without reminders.
Frames are a production environment, not an inspection report.
Three lines
How plants work with us
P1 · Distribution
Equipment of partner factories
Official representation of Chinese line factories. Quality without a brand markup — inspection and samples.
Cycle — months · Project procurement
P2 · Stock
Running positions in stock
Running spare parts under a Tashkent stocking programme. Availability and lead time confirmed in the first reply.
Cycle — days · Shipped from stock
P3 · Custom sourcing
Factory search for a part number
An analogue by photo, part number or drawing: measurement, options, inspection, delivery.
Cycle — 6–10 weeks · To drawing
Partner factories
Factories we work with
An active partnership and factories in negotiations. Names are disclosed after your request.
The factory page is in Russian for now — send your request in any language.
Inspection
Failed inspection — the lot does not ship
Inspection at the factory before shipment. Every point comes with a photo report, lot number in frame.
| No. | Control point | What we record |
|---|---|---|
| 01 | Geometry measurement | Dimensions against drawing or sample, tolerances — into the act |
| 02 | Material | Grade and hardness per factory certificate |
| 03 | Marking and completeness | Lot number, line-by-line match to specification |
| 04 | Packing | For sea and rail transport, photo before closing |
Guarantee
Defects — replaced at our expense
Confirmed by the act — replaced at our cost, delivery included.
Prepayment
Failed inspection — refund
Reassembly of the order or refund of the prepayment within 10 business days — your choice.
Route
The cargo's path — five statuses without your reminders
Every point — a status and a photo. The frames below are a generative environment, not an inspection report: the photo report for your batch is sent separately.

01 · Placed
Order at the factory, production time fixed in the specification

02 · Inspection
Measurement, material, marking, packing — photo report with the lot number

03 · Shipped
The lot is on its way — by rail or by road

04 · Customs
Clearance and certification are on us, documents prepared in advance

05 · Warehouse
Acceptance at your warehouse, act signed — supply closed
Reply to a request by part number, photo or drawing
Specification with options and recommendation
Urgent — when the line is down
Industries
Line productions where downtime costs more than the part
01 · Slate and fiber cement
Press felt · forming wire of the sheet machine · heavy-series bearings · knives · gearboxes · frequency drives
02 · Corrugated board
Corrugating rolls · heating cylinders · slitting knives · glue and pressure rollers · belts
03 · Printing
Offset blankets · rollers · guillotine knives · UV lamps — consumables of printing lines
Not your industry — same process: part number or drawing, then four steps.
Questions
What plants ask before the first supply
Didn't find your question — ask in the form, reply within 48 working hours.
A part number is enough. Send it via the form, Telegram or email — we reply within 48 working hours, price in the first reply. A photo or drawing speeds up sourcing but is not required.
We source an analogue by photo, part number or drawing: measurement, three options, our recommendation. Custom sourcing cycle — 6–10 weeks including inspection and delivery.
The lot is inspected at the factory before shipment: geometry, material per certificate, marking, packing. Every point comes with a photo report, lot number in frame. Failed — not shipped.
Your choice: reassembly of the order or refund of the prepayment within 10 business days. If reassembly costs more, we agree the difference in writing before production starts.
Ours. A defect confirmed by the inspection act is replaced at our cost — including delivery of the replacement.
At once: unit and volume price — in the first reply. The exact amount for the lot — in the specification within 5 business days, urgent — 24 hours.
The process does not depend on the industry: part number, drawing or photo of the unit — then the same four steps. We know line productions best: slate, corrugated board, printing.
Request
Send the part number — we do the rest
We reply within 48 working hours, price in the first reply. Photos and drawings — after the reply.