
New line for slate production
We supply fiber cement and asbestos cement sheet lines by the Hatschek process. We start with the technical specification: product, raw materials, output, curing and site conditions.
+998 99 011 62 29Tashkent, Uzbekistan · UTC+5
For selection
What to send for selection
The fuller the data, the more accurate the selection. Send it in the request below or as photos on Telegram.
- 01
Product and standard
Sheet type, profile, dimensions, thicknesses, coloring and test standard.
- 02
Raw materials
Cement, fibers, fillers, water: the more precisely the raw materials are described, the more accurate the selection.
- 03
Output
How many good sheets of your format per shift and how many shifts per day.
- 04
Process and curing
Forming method, whether a press is needed, how the sheet cures: chambers and air curing, or an autoclave.
- 05
Site conditions
Grid and available power, fuel for the boiler, water, climate, hall height and crane.
- 06
Scope of supply
A list by process stage: what the plant supplies, what you do.
Catalog items
001 
How we work
One bureau, from the plant to the acceptance report
- 01
Contract with the manufacturing plant
Supply runs under a contract between the bureau and the plant that makes the item.
- 02
Inspection before shipment
The lot is checked before shipment: measurement, material, marking, packing. The result is a report and photographs.
- 03
Replacement of defects under a report
A defect is replaced under the report: the manufacturing plant supplies the replacement under its contract with the bureau, and the bureau follows it through.
- 04
Customs and certification handled by the bureau
The bureau takes on customs clearance and certification.
Frequently asked questions
Which sheet, from what raw materials, how much, how it cures, where the line stands, what it is fed by and who works on it. Without these answers the proposals of different plants cannot be compared.
More in the article: New slate line: what to decide before talking to a plant
Otherwise each seller will fill in its own answers, and the proposals will turn out to be for different lines. An identical request is the only way to get comparable answers.
More in the article: New slate line: what to decide before talking to a plant
There is no general answer: compare specific proposals on the same points: scope of supply, wear parts and spares, commissioning and training, documents, risks.
More in the article: Chinese, European or used line: how to compare
Yes, but the plant must be told at once: the set of machines after forming depends on the product.
More in the article: New slate line: what to decide before talking to a plant
Parts in contact with the wet abrasive slurry or with the sheet: forming felts, mesh cylinder screens, knives, roll bearings, slurry pumps.
More in the article: Slate line machines and which parts wear out first
In one table: a row per item with the unit, marking, annual consumption, stock on hand and quantity to order. Consumption is taken from the replacement log, not from what the mechanic remembers.
More in the article: How to draw up a slate plant's annual request for parts and felts
Related articles
- New slate line: what to decide before talking to a plantBefore you ask a manufacturing plant for a line quotation, decide seven things: which sheet you will make, from what raw materials, how many sheets per shift the market needs, how the sheet will cure, where the line will stand, where steam, water and electricity will come from, and who will run it. Without these answers, quotations from different plants cannot be compared.
- Chinese, European or used line: how to compareLines are compared not by country and not by the first figure in the quotation, but by five things: what is in the supply, which units wear fastest and where to get spare parts for them, who starts the line up and trains the staff, what documents come with it, and which risks stay with you. A table with these items for each option is the comparison.
- Technical specification for a slate line: what to write to the plantA technical specification is your requirements for the line on paper: which sheet and to which standard, from what raw materials, how much per shift, how it cures, what is in the supply, what automation, in what language the documents are, which spare parts and training, how you will accept it. It is attached to the contract, and the line is later accepted against it.
- Slate line machines and which parts wear out firstA fibre-cement sheet line is a chain of stages: raw material preparation, milling, fibre opening, the forming machine, press, curing, demolding, autoclave, cutting. What wears out first is whatever rubs against the slurry and the sheet: forming felts, screens, knives, shaft bearings and slurry pumps.