

Four-station demolding machine with pallet lubrication unit
- Bureau part number
- TMN-XHB-06
Separates the sheet and the pallet after pre-curing. The trolley with the stack is rolled under the machine, the pallet is separated from the sheet, and the sheet moves on to the next stage. A sucker transfers the pallet to the roller table of the lubrication unit, where it is washed and greased; the cleaned pallets are stacked and returned to the stacker. Pre-curing before demolding takes 4–5 hours at a chamber temperature of 40–60 °C.
- Brand
- Xinhuibo
- Category
- Standalone machine
- Industry
- Asbestos and fiber cement
- Availability
- Project supply
Specifications
- Pre-curing
- 4–5 h · 40–60 °C
- Servo motor
- 5.5–15 kW
- Rotation speed
- 2000–3000 rpm
- Gearbox
- QJ-L200-16
- Fan
- 11–18.5 kW · 2900 rpm
- Sucker height
- 1300–1500 mm
- Sucker stroke
- 2000 mm
- 01
We find
The manufacturing factory, by part number, drawing or a photo of the unit.
- 02
We agree
Price, tolerances, warranty and terms — in writing, before production.
- 03
We inspect
The lot at the factory before shipment. The report and photographs come to you.
- 04
We deliver
By air, rail or road — the route follows the value of the lot and how urgently it is needed.
- 05
We coordinate
Supervised installation and start-up are carried out by the manufacturing plant. We arrange the visit of its engineers, translation and site access.




