
Felts and meshXinhuibo
Asbestos-cement forming felt 94047 · 1700 g/m²
Basis weight1700г/м²
- TAMINOTA part number
- TMN-XHB-F01
- Manufacturer part number
- 94047
A forming felt for the production of asbestos cement sheet and asbestos cement pipes. Plain weave, good dewatering. Sized to the width of the customer’s machine.
- Brand
- Xinhuibo
- Category
- Felts and mesh
- Industry
- Asbestos and fiber cement
- Availability
- Made to order
What to send for selection
- 01Machine model and forming method
- 02Slurry: asbestos cement or fiber cement
- 03Belt length under tension and width — from the machine passport or a previous order
- 04Joint: endless or seamed
- 05Photos of the machine nameplate and the old felt
Specifications
TMN-XHB-F01
- Weave
- Полотняное
- Purpose
- Шифер · трубы
Dimensions for ordering
- Basis weight
- 1700 г/м²
- Width
- confirmed from your machine dimensions
- Belt length
- confirmed from your machine dimensions
- Thickness
- confirmed from your machine dimensions
- Air permeability
- confirmed from your machine dimensions
How to get this item
- 01You send the part number or a nameplate photo
- 02You get the plant’s invoice and a lead time
- 03Inspection at the plant, delivery, documents
Related articles
- What is checked at the plant before shipmentFour things are checked before shipment: is it the right item, do the dimensions fit, is the whole lot there, and will the packing survive the trip. This is the only moment when a mistake can be fixed at the plant rather than after delivery.
- Forming felt for sheet lines: how to choose and when to changeChoose the felt by the slurry the machine runs on (asbestos cement or fibre cement), the type of fabric (woven or needle-punched), the density in g/m² and the exact width and length of your machine. Change it when it clogs and drains poorly, stretches or starts to mark the sheet.
- Why forming felt clogs fast and how to make it last longerThe felt on a sheet machine is clogged by cement and fines from the slurry; this is unavoidable. It clogs fast when washing cannot cope, when the slurry is not what it should be, or when the felt does not suit the slurry. Its life is extended by sprays, suction, correct tension and a stable slurry, not only by changing the supplier.
- Fitting a new felt on the machine without ruining it in the first daysA new felt goes onto a clean machine with checked rolls, doctors and sprays, strictly along the direction arrow. Tension it gradually, bring it up to speed with water and only then feed slurry. A new felt is ruined by skew, dirt on the rolls, sudden tension, a dry start and knocks against the edge.
- Forming machine spare parts to keep in stock for a yearFor a Hatschek machine keep in stock what is made to your machine's size and what stops it when missing: felts, cylinder screens, vacuum box strips, knives, coverings and roll bearings, pump impellers and liners, spray nozzles. Work out the quantity from your own replacement log, not from someone else's norm.
- How to measure a forming felt and cylinder screen for an orderTo order a felt you need the length of the closed loop under working tension, the width, the joint type (endless or seamed), the fabric type and density, the slurry and the machine. Take the length from the machine passport or a previous order; if you measure on the machine, use a non-stretch cord with the tensioner at mid-travel, never the old felt lying on the floor.
- g/m², air permeability, thickness: how to read a felt specificationThe main lines in a felt specification are density in g/m², thickness, air permeability, tensile strength and elongation, material and fabric type. Density and material can be compared between plants directly. Thickness and air permeability can be compared only if they were measured the same way: under the same load, the same pressure drop and in the same units.
- How to trial a felt from another maker without risking outputA new felt is trialed on one machine, with a proven felt in reserve nearby. Before installation, record how your current felts perform; during the trial, record vacuum, sheet thickness and moisture, marks on the sheet, washes and the day of removal. Compare felts of the same age. One trial felt shows whether the fabric suits your machine at all, but does not prove the whole lot will be the same.
- When to order spare parts so you do not stand in the seasonCount from the date the part must be in your hands: the start of the repair shutdown or the start of the sales season. From it subtract the production time, transport, customs and a reserve for the unexpected — that gives the last order day for each item. Felts, screens, parts to drawing and large bearings are ordered first; off-the-shelf consumables last.
- How to draw up a slate plant's annual request for parts and feltsAn annual request is one table by lines and units: item, marking or size, consumption per year, stock, how much to order, urgency, who approved. Consumption is taken from the replacement log, not from memory. Items are divided into long (felts, screens, parts to drawing) and quick, and the long ones are sent as one package in advance.
- Why a spare felt spoils on the shelf and how to store itFelts are made mainly of polyamide (nylon). In light it loses strength, with moisture it changes size, and under a load or at folds the fabric creases and cakes. So spare felt is kept in the factory packaging, in a dry dark room, off the floor, with no load on top and no folds, with a lot label and date, and the earlier arrival goes on the machine first.
- How to choose a felt and screen supplier: what to ask before orderingBefore ordering, find out five things: whether the supplier makes the felts himself or resells them; on what slurries and machines his felts already work; whether there is a data sheet with the test methods; how he keeps lots uniform; how he handles a claim. Then one trial felt on your machine, and only after that a stock.
- Why a slate sheet delaminates and how to find the causeA sheet delaminates when the layers built up on the format drum did not bond to each other. Look for the cause along the path of the sheet: slurry, screen, felt, vacuum, drum pressure and press, curing, demolding. Most often the culprits are a film that is too wet or too dry, a clogged felt and weak compaction.
- Sheet thickness varies across or along: what has gone wrongThickness that varies across the width of the sheet almost always comes from an uneven layer building up on the screen or felt: a clogged screen, a skewed or worn felt, uneven vacuum across the width. Thickness that varies along the length and from sheet to sheet comes from slurry concentration and the number of turns on the format drum.
- Felt or screen marks on the sheet surface: defect or normalA light, even felt pattern on the underside of a corrugated sheet is normal: under GOST the back of the sheet is by definition the surface with felt or mesh imprints. The mark becomes a defect when it is sharp and uneven: a stripe from the seam, the imprint of a coarse yarn, patches from clogged areas. Then it points to a worn or greasy felt, wrong tension or wrong squeezing.
- Slate lets water through: watertightness and water absorptionWatertightness is whether water passes through the sheet: under the GOST a column of water is placed on the sheet and after a day the underside is checked for drops. Water absorption is how much water the sheet soaks up; the GOST does not set a limit for it but gives a method. A porous sheet that soaks up a lot of water and lets it through most often has too little cement, weak compaction or early curing.
- The Hatschek process in plain words: how a sheet is made from slurryIn the Hatschek process the sheet is built from many thin films. A mesh cylinder in a vat of liquid slurry filters out the water and leaves a film on the screen, the felt lifts it off and carries it over the vacuum to the format drum, and the drum winds it on layer after layer to the required thickness. Then the wrap is cut open, the sheet is corrugated or left flat, and sent to curing.
- How much vacuum a sheet needs, and what too little or too much doesThe vacuum under the felt sucks water out of the film before it reaches the format drum. Too little vacuum and the film arrives wet, the layers press together poorly, and the sheet slumps and delaminates. Too much and the film dries out and bonds worse with the next layer, and the felt wears and clogs faster. There is no single number for all lines: the vacuum level is set by the regulations and watched by the gauge and by the sheet.
- GOST 30340-2012: what it requires of a corrugated sheetGOST 30340-2012 is the interstate standard for corrugated chrysotile-cement sheets and their fittings. It sets two profiles, dimensions and tolerances, strength, density, impact toughness, water tightness and frost resistance, and requirements for appearance, marking, acceptance and storage. It replaced GOST 30340-95 and, for corrugated sheets, GOST 8747-88 and GOST 30301-95.
- How slate is tested: bending, density, water absorption, frostSlate is checked for bending strength and strength under load, for density, impact toughness, water tightness, water absorption and frost resistance. The methods for corrugated sheets are now in GOST 30340-2012, for flat sheets in GOST 18124-2012; before that they were in GOST 8747-88. Each test answers its own question about the sheet, and each has its own specimen preparation.
- A buyer complains about slate: how to work through the claimA claim is worked through in order: lot number and quality document, photos and the place of the defect, how the sheet was stored, transported and fastened, then sampling and testing to GOST. Under GOST 30340-2012 the manufacturer is responsible for the sheet conforming to the standard if the buyer observed the rules of transport, storage and use. The aim of the review is to tell a production defect from an installation error and to find the cause in both cases.
- Felt, screen, format drum: a glossary of the slate plantShort explanations of the words heard on the floor of a slate plant: from the vat and the cylinder screen to demolding, the autoclave and trimmings. The glossary is for the buyer who writes the request and for a new person on the line. Each word says what it is and which article to read next.
- Rubber-covered rolls: Shore hardness and when to recover themOn a slate machine the rolls that press on the felt are rubber-covered: the couch roll over the cylinder screen, the roll that presses the felt to the format drum, some guide and transport rolls. Cover hardness is measured on the Shore A scale. A roll is recovered when the cover peels, cracks, wears unevenly or goes out of tolerance on hardness and diameter.
- Slate line stopped: what to do in the first hoursWhen a line stops for a long time, the main thing in the first hours is not to let the cement slurry harden where you would later have to chip it out: in the vats, agitators, pipes, on the screens and the felt. Keep the slurry moving or drain it, wash the screens and felt, then look for the cause, and only after that order the part.
- Failure log: how to tell what breaks most often on the lineA failure log is one line for every stop of the line: when it stopped, which unit, what happened, why, which part was replaced, how long it stood. After a month or two these lines show a few units that give most of the downtime. That is where spare parts stock and planned repairs are concentrated.
- Planned maintenance of a slate line: what to do at each stopPlanned maintenance of a slate line has three levels: an inspection every shift, a short planned stop and a major seasonal overhaul. Each level has its own list of work and its own list of spare parts. The major overhaul is set for the time when slate sales are lower, and the parts for it are ordered in advance.
- Slate plant recycled water: how the closed loop worksAlmost all the water that the slurry gives up through the screen, the felt and the vacuum does not go down the drain but returns to work. It is collected and left to settle in the recuperator, the clarified water goes to thin the slurry and wash the felt, and the settled slurry goes back into production. The loop holds as long as someone watches it: alkali, salts and fines build up in recycled water.
- Chinese, European or used line: how to compareLines are compared not by country and not by the first figure in the quotation, but by five things: what is in the supply, which units wear fastest and where to get spare parts for them, who starts the line up and trains the staff, what documents come with it, and which risks stay with you. A table with these items for each option is the comparison.
- Buying a used slate line: what to check before payingBefore paying for a used line, it is inspected on site while it is still assembled and, best of all, running: year of manufacture and hours of operation, condition of the shafts, vats, screens, format drum and press, electrics and controller programs, autoclave and boiler documents, completeness against the inventory. Separately, decide who will dismantle, transport and reassemble it, and how.
- Technical specification for a slate line: what to write to the plantA technical specification is your requirements for the line on paper: which sheet and to which standard, from what raw materials, how much per shift, how it cures, what is in the supply, what automation, in what language the documents are, which spare parts and training, how you will accept it. It is attached to the contract, and the line is later accepted against it.
- Starting a new line: what goes wrong in the first weeksIn the first weeks a new line almost always gives less sheet and more rejects than promised: the slurry and felts are not yet matched to your raw materials and water, the shifts are learning, the units are running in, small installation flaws surface one after another. This is normal if every stoppage and every kind of reject is recorded: these records are needed both for tuning and for the warranty.
Request
Send a part number or a photo — we will find the factory
Items from the catalog · 1
- TMN-XHB-F01 · Asbestos-cement forming felt 94047 · 1700 g/m²