A failure log is one line for every stop of the line: when it stopped, which unit, what happened, why, which part was replaced, how long it stood. After a month or two these lines show a few units that give most of the downtime. That is where spare parts stock and planned repairs are concentrated.

Updated 5 min read

In short

5minutes to read

6sections

5sources

4catalog items

In this article

  1. 01What the owner and the buyer should decide
  2. 02What to record on each line
  3. 03How to find the leading units after a month
  4. 04What to do with the result
  5. 05Common mistakes
TableWhat to record on each line7 rows →
Contents
  1. What the owner and the buyer should decide
  2. What to record on each line
  3. How to find the leading units after a month
  4. What to do with the result
  5. Common mistakes
  6. How we do it

A failure log is a notebook or a spreadsheet in which, for every stop of the line, one line is written: date and time, unit, what happened, why, what was replaced, how long it stood. The log repairs nothing by itself. It is needed so that after a month or two you can answer the question "what breaks most often with us and what does it cost in hours of downtime". Usually the answer is a few units that account for most of the stops. The spare parts stock is built around them, repairs are planned around them, and they are the first to be looked at when equipment is replaced.

What the owner and the buyer should decide

  • Who keeps it. The line is written by the shift mechanic or shift foreman right after the line restarts, not from memory at the end of the week.
  • Where it is kept. A shared spreadsheet or a stitched notebook is enough. Maintenance tracking software is more convenient, but the log works just as well without it.
  • Who reads it. Once a month the chief mechanic sums up the log, the buyer gets the list of leading units and compares it with the stock.
  • What next. For the leading units one of three things is decided: keep a spare part, shorten the inspection interval, or look for the cause and replace the unit.

What to record on each line

FieldExample entryWhy
Date, time of stop and restart14.11, 03:20–05:05to count downtime
Section and unitforming machine, feltto group failures
What is seen (failure mode)felt torn along the edgeto tell similar breakdowns apart
Cause, if foundscoring against the edge of a vacuum boxto look for the root, not the consequence
What was donereplaced the felt, cleaned the box coverto understand what was used to fix it
Which part was usedfelt, part number or sizeto write off from stock and reorder
Whoname of the mechanicto clarify details

The main rule is to call the same thing by the same name. If one mechanic writes "shaft bearing", another "shaft rattles", a third "support", after a month these lines will not add up into one group. It is better to draw up in advance a short list of the units of the line (forming machine by units, press, cutting, demolding, stacker, slurry preparation, pumps, compressor) and a list of failure modes, and write only from the lists.

The international standard ISO 14224 on collecting equipment reliability data is built the same way. It separates how a failure showed itself, the cause of the failure and the action taken, and ties a unit and a downtime to every record. The standard is written for oil and gas equipment, but the principle itself, to separate "what is seen" from "why", suits any plant.

How to find the leading units after a month

  1. Add up the downtime for each unit over the month.
  2. Sort the units from the largest downtime to the smallest.
  3. Count what share of all downtime the first three to five lines give.

This kind of analysis is called Pareto analysis. In many industries a small part of the units gives most of the unplanned stops. This is an observation, not a law: on your line the picture may be more even, so the table decides, not the "80 to 20" rule.

It is worth counting in two cuts:

  • by hours of downtime, which shows what costs the plant most;
  • by number of failures, which shows what breaks often even if it is fixed quickly. Such parts must also be at hand.

What to do with the result

  • Stock. The parts of the leading units go into permanent stock: felts, screens, bearings of critical shafts, cutting knives and discs, press and pump seals. How to count the quantity is covered in the article on the spare parts stock for the line.
  • Planned repair. If a unit breaks regularly, its inspection and the replacement of its parts are moved into a planned stop, before it stops by itself.
  • Looking for the cause. If one part is replaced more and more often, the cause may lie in a neighboring unit: shaft misalignment tears the felt, dirty lubricant ruins bearings. This shows in the "cause" field.
  • Request. When ordering, it is convenient to attach an extract from the log to the request: which unit, how many times per season, what was replaced. This makes it easier to select a part that will last longer than the previous one.

Common mistakes

  • Short stops "for five minutes" are not written down. Hours are made up of such stops.
  • Only "what was replaced" is written without "what is seen", and then wear cannot be told apart from a breakdown caused by a neighboring unit.
  • The log is kept but not read. Without a monthly review it turns into an archive.

How we do it

  • We look for spare part items at the manufacturing plant by number, drawing or photo of the unit. What we find, with the price and photos, we send before the order.
  • We inspect the lot at the plant before shipment: part number, dimensions, lot, packaging.

What this article relies on

Below are the documents and materials we refer to, so that you can check what is said for yourself.

Standards and documents

  • ISO 14224:2016 "Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment": the standard's page, the composition of failure and repair datatext ↗
  • Selvik J. T., Isaksen S. "ISO 14224 — collection and exchange of reliability data", Standards Norway seminar presentation: failure mode, failure cause, mechanismtext ↗

Reference materials

  • Reliable Plant, "The Power of Pareto Analysis in Maintenance": ranking units by unplanned downtime at a pulp millreliableplant.com ↗
  • Tractian, "Pareto Chart: How to Apply to Eliminate Equipment Failures": grouping failures by unit and mode, the role of record qualitytractian.com ↗
  • Accendo Reliability, "Capture the right failure data": a failure code as a combination of unit, failure mode, cause and actionaccendoreliability.com ↗

The log form is drawn up on the principles of ISO 14224 and simplified for a slate line; draw up the list of units from your own machine.

Related catalog items

  • 001

    Asbestos-cement forming felt 94047 · 1700 g/m²

    TMN-XHB-F01Xinhuibo

  • 002

    Fiber-cement forming felt 94047-1 · 1650 g/m²

    TMN-XHB-F02Xinhuibo

  • 003NSK 22310 EAE4 spherical roller bearing

    NSK 22310 EAE4 spherical roller bearing

    TMN-NSK-22310NSK

  • 004Circular knife for trimming asbestos-cement sheet

    Circular knife for trimming asbestos-cement sheet

    TMN-280-1303

For slate plants

Felts, meshes and units for your line

We select from manufacturing plants in China by nameplate photo and machine dimensions. Send a photo of the plate and we will tell you what can be ordered.

Request

Ask about your machine

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.

Up to 3 files: photos (JPG, PNG, WEBP, HEIC) or PDF, up to 15 MB in total

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.