Output and defect records by shift: a simple system, no software

One sheet per shift is enough: how many sheets were formed, how many accepted, how many went to defects and by which type of defect, how long the line stood and why. From this the defect rate by shift is calculated, and the defect types are tied to the units of the line. After a month it is clear which unit causes the most losses.

Updated 4 min read

In short

4minutes to read

6sections

4sources

2catalog items

In this article

  1. 01What the owner should decide
  2. 02The shift sheet: what is in it
  3. 03How to calculate the defect rate
  4. 04How to tie defects to the units of the line
  5. 05How this works in quality systems
TableThe shift sheet: what is in it8 rows →
Contents
  1. What the owner should decide
  2. The shift sheet: what is in it
  3. How to calculate the defect rate
  4. How to tie defects to the units of the line
  5. How this works in quality systems
  6. How we do it

Records of output and defects by shift can be kept on one paper sheet or in one shared spreadsheet. It has five columns: how many sheets were formed, how many accepted, how many went to defects and by which type of defect, how long the line stood and for what reason. From these figures the defect rate is calculated for each shift, and if defects are recorded by type, they can be tied to the units of the line: delamination to the felt, vacuum and press; uneven thickness to the slurry and screens; a torn edge to the cutting. After a month it is clear where the plant loses the most sheets.

What the owner should decide

  • Who fills it in. The shift foreman fills in output and downtime; the quality control inspector or lab technician fills in defects by type. Both sign.
  • When. At the end of the shift, before handing over to the next.
  • Who reads it. The technologist every day, the owner a summary once a week and once a month.
  • What to do with the figures. If the defect rate has grown, the review starts with the defect type that grew and the unit responsible for it.

The shift sheet: what is in it

ColumnWhat to write
Date, shift, foremanwho is responsible
Productprofile or sheet format, thickness
Formedhow many sheets were taken off the machine
Accepted by QChow many passed on appearance and dimensions
Defects by typedelamination, cracks, uneven thickness, crooked wave, torn edge, breakage at demolding and stacking, other
What was done with the defectsto recycling, to a markdown, to waste
Downtimetime and cause, a reference to the line of the failure log
Remarksfelt change, change of raw materials, batching failure

It is important that the defect types are the same list for all shifts. Otherwise "cracked", "broke" and "breakage" will spread over different columns and will not add up.

For corrugated sheet, GOST 30340-2012 calls a lot the shift output of one line. If records are kept by shift, they coincide with the lot for which the plant issues the quality document. It is convenient to file the lot test results next to the shift sheet.

How to calculate the defect rate

Defect rate of a shift = defective sheets ÷ formed sheets × 100%.

Both the total rate and the rate for each type are calculated. The total rate shows whether the shift went well. The rate by type shows what exactly went wrong.

What not to do:

  • do not mix forming defects and breakage in storage and loading into one figure: their causes are different;
  • do not compare shifts that made different products without a note of which sheet was running;
  • do not hide the defects that went to recycling: for the records they are defects all the same.

How to tie defects to the units of the line

Defect typeWhich units to look at first
Delaminationslurry, felt, vacuum boxes, pressing, press, curing
Crackscuring, demolding, stacking, storage
Uneven thicknessslurry concentration, screens, felt, thickness sensor
Crooked wave, edgecorrugator, templates, cutting
Torn edgecutting knives and discs
Breakage at demoldingdemolding machine, suction cups, pallets

This is not a diagnosis but a hint of where to start. Each defect type is covered in detail in separate articles of the section.

Once a month the defects are summed by type in the same way as the failures in the failure log: from largest to smallest. Two or three defect types will end up at the top. They are compared with the failure log: if the rise in delamination coincided with felt wear or a drop in vacuum, the cause is almost found.

How this works in quality systems

The international standard ISO 9001 requires that nonconforming product be identified and not reach the buyer by chance, and that a record be kept for each case: what is wrong, what was done about it, who made the decision. A shift sheet with the columns "defects by type" and "what was done with the defects" covers this idea without any software. An ISO 9001 certificate is not needed for it, only the habit of writing every day.

How we do it

  • From the photo, dimensions and the passport of the unit, we look for the item at the manufacturing plant. What we find, with the price, photos and specifications, we send before the order.
  • We inspect the lot at the plant before shipment: part number, dimensions, lot, packaging.

What this article relies on

Below are the documents and materials we refer to, so that you can check what is said for yourself.

Standards and documents

  • GOST 30340-2012 "Chrysotile-cement corrugated sheets. Specifications": a lot as the shift output of the line, the quality document, requirements for appearancetext ↗
  • ISO 9001:2015, clause 8.7 "Control of nonconforming outputs", as retold in an ISMS.online review: identification, control and records of nonconformitiestext ↗

Reference materials

  • The Core Solution, "ISO 9001:2015 Clause 8.7 explained": what to record about a nonconformity and the measures takenthecoresolution.com ↗
  • Reliable Plant, "The Power of Pareto Analysis in Maintenance": ranking causes of loss from largest to smallestreliableplant.com ↗

The shift sheet form is an example; the list of defect types and the procedure for handling them are set by the process regulations of your plant.

Related catalog items

  • 001PLC-based line automation system

    PLC-based line automation system

    TMN-XHB-09Xinhuibo

  • 002KELI XK3101-N weighing indicator

    KELI XK3101-N weighing indicator

    TMN-KELI-XK3101NKELI

For slate plants

Felts, meshes and units for your line

We select from manufacturing plants in China by nameplate photo and machine dimensions. Send a photo of the plate and we will tell you what can be ordered.

Request

Ask about your machine

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.

Up to 3 files: photos (JPG, PNG, WEBP, HEIC) or PDF, up to 15 MB in total

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.