Autoclave, curing chambers and steam boilers
We supply autoclaves for fiber cement sheet and steam boilers fired by coal, biomass, gas and liquid fuel. The boiler is selected by the steam consumers and their peak load.
+998 99 011 62 29Tashkent, Uzbekistan · UTC+5
For selection
What to send for selection
The fuller the data, the more accurate the selection. Send it in the request below or as photos on Telegram.
- 01
Steam consumers
Autoclaves: volume, working pressure, weight of the shell and carts; curing chambers: volume and temperature.
- 02
Cycle modes
Heating, holding and release times, number of cycles per day and the hourly schedule.
- 03
Load and moisture
Load weight and sheet moisture, from your own measurement.
- 04
Steam line
Length of the steam line and whether it is insulated.
- 05
Feed water
Its temperature: whether there is condensate return and a deaerator.
- 06
Fuel and water analysis
Which fuel is available for the boiler, and the water analysis.
Catalog items
How we work
One bureau, from the plant to the acceptance report
- 01
Contract with the manufacturing plant
Supply runs under a contract between the bureau and the plant that makes the item.
- 02
Inspection before shipment
The lot is checked before shipment: measurement, material, marking, packing. The result is a report and photographs.
- 03
Replacement of defects under a report
A defect is replaced under the report: the manufacturing plant supplies the replacement under its contract with the bureau, and the bureau follows it through.
- 04
Customs and certification handled by the bureau
The bureau takes on customs clearance and certification.
Frequently asked questions
From the steam consumers. On an autoclave line the main consumer is the autoclave; on a natural-curing line, the curing chambers. For each, a mode is needed: to what temperature to heat and in what time.
More in the article: How much steam a slate plant needs: estimating the boiler
Most steam goes out at the start of the cycle, during heating. If two autoclaves start heating at the same time, the peak doubles, so the cycle schedule matters as much as the autoclave itself.
More in the article: How much steam a slate plant needs: estimating the boiler
It is the steam output as if the feed water arrived at 100 °C and the steam were produced at atmospheric pressure. At your pressure and with your water the boiler will give less, so ask for the figure at your conditions.
More in the article: How much steam a slate plant needs: estimating the boiler
Often the shortage is not the boiler. First check the steam network: insulation, steam traps, condensate return. If after repairing the network there is still too little steam, the list of consumers for the calculation is already ready.
More in the article: Where a slate plant needs steam and how not to lose it on the way
An autoclave falls under the technical regulation on the safety of equipment under excess pressure (Cabinet of Ministers Resolution No. 493 of 04.08.2025). The vessel passport and the manufacturer instructions and manual are requested before purchase, not after. Registration and permits are clarified with the Industrial Safety Committee before the autoclave arrives on site.
More in the article: Autoclave at a slate plant: what it is for and what gets serviced
The passport or the plate from the shell, a photo of the lid, the seal in its groove and the lock, seal dimensions (diameter along the groove, section, material), nameplates of valves and steam traps, working pressure and temperature per the regulation.
More in the article: Autoclave at a slate plant: what it is for and what gets serviced
Related articles
- Autoclave at a slate plant: what it is for and what gets servicedAn autoclave is needed where the mix contains ground quartz sand: under saturated steam pressure the sand reacts with the lime from the cement, and the sheet gains strength in a single cycle. What wears out in it: the seal of the quick-opening lid and its mechanism, steam traps and drainage, valves and safety valves, rails and cars. In Uzbekistan the autoclave is pressure equipment and falls under technical regulation CMR No. 493.
- Curing chambers: temperature, humidity and where rejects come fromIn the curing chamber the green sheet gains the strength to be taken off the pallet without breaking. Three things cause rejects here: heat applied before the cement began to set; temperature raised too fast or unevenly; the sheet losing water to dry air and drafts.
- Where a slate plant needs steam and how not to lose it on the wayAt a slate plant steam goes to the autoclave, to the curing chambers and, in winter, to heating water and buildings. It is lost on the way in three places: bare pipes and valves without insulation, faulty steam traps, and condensate drained into a ditch instead of returned to the boiler house.
- How much steam a slate plant needs: estimating the boilerBoiler capacity is worked out not from the floor area of the shop and not from a salesman's advice, but from the steam consumers: how much heat goes into warming the autoclave, the cars and the sheets, how much is lost through the walls and the steam line, and how often the cycles overlap. The main consumer is the heat-up: the peak rests on it. Then the boiler figure is converted from the nominal one to the actual one: it depends on the pressure and on the feedwater temperature.