0In the list
Steam boiler on a trailer before shipment
Catalog item

Corner-tube boiler

Bureau part number
TMN-STG-03

A furnace with full membrane walls and water-cooled corners. Heat losses are lower, the risk of slagging is smaller, and it suits biomass and large outputs better. The figures in the plant catalog are given per project rather than as a range — the specification is calculated for the fuel and the pressure of the enterprise.

Brand
Sitong
Category
Boilers
Industry
Asbestos and fiber cement · Corrugated board · Printing · Suits any industry
Availability
Made to order
Request a price

Specifications

Steam output
По заданию
Fuel
Биомасса · уголь
Layout
Полностью экранированная топка
How the bureau brings this item
  1. 01

    We find

    The manufacturing factory, by part number, drawing or a photo of the unit.

  2. 02

    We agree

    Price, tolerances, warranty and terms — in writing, before production.

  3. 03

    We inspect

    The lot at the factory before shipment. The report and photographs come to you.

  4. 04

    We deliver

    By air, rail or road — the route follows the value of the lot and how urgently it is needed.

  5. 05

    We coordinate

    Supervised installation and start-up are carried out by the manufacturing plant. We arrange the visit of its engineers, translation and site access.

Nearby in this category

  • 001Welding area of the boiler plant

    DZL packaged steam boiler, coal and biomass

    TMN-STG-01Sitong

  • 002Building of the boiler plant

    SZL assembled steam boiler, coal and biomass

    TMN-STG-02Sitong

  • 003Welding area of the boiler plant

    Circulating fluidized bed boiler DHX

    TMN-STG-04Sitong

  • 004Building of the boiler plant

    WNS gas- and oil-fired steam boiler

    TMN-STG-05Sitong

Sourcing by part number

Send a part number — we will find the factory

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.