BoilersSitong
SZL assembled steam boiler, coal and biomass
Steam output2–25т/ч
- TAMINOTA part number
- TMN-STG-02
- Working pressure
- 1.25 / 1.6 / 2.0 / 2.5 MPa
- Efficiency
- 80–83 %
A water-tube boiler of two-drum layout; it arrives in two parts and is assembled on site — which is exactly why it is chosen where a packaged boiler no longer fits the clearance. The upper drum carries a steam separator and a header. The values were calculated for class II bituminous coal with a heating value of 5000 kcal.
- Brand
- Sitong
- Category
- Boilers
- Industry
- Asbestos and fiber cement · Corrugated board · Printing · Suits any industry
- Availability
- Made to order
What to send for selection
- 01Part number or the number on the nameplate
- 02Photos of the unit and its nameplate
- 03Model of the machine the unit is fitted to
- 04Quantity
Specifications
TMN-STG-02
- Fuel consumption
- 300–3750 кг/ч
- Dimensions
- 5.5×2.35×3.52 … 16.95×4.5×6.5 m
- Boiler weight
- 25–120 т
How to get this item
- 01You send the part number or a nameplate photo
- 02You get the plant’s invoice and a lead time
- 03Inspection at the plant, delivery, documents
Related articles
- How cargo travels from China to Uzbekistan: road, border, customsCargo from China goes by rail through Kazakhstan, by truck, or by a mixed route through Kyrgyzstan. Urgent, light items go by air. At each border it is reloaded or its seal is checked, and in Uzbekistan it is cleared under a declaration.
- What to put in a contract with a plant in ChinaThe contract should cover everything you may later dispute: what exactly is supplied, how many, on what delivery and payment terms, how it is inspected before shipment and on acceptance, what happens with defects, what warranty applies, and under which law and where a dispute is settled. What is not in the contract, the plant does not owe you.
- Warranty on equipment from China: from which day and what it coversHow long the warranty lasts and from which day it runs is decided by the contract. If the contract sets no date, under Uzbek law the period runs from the handing over of the goods. The warranty covers manufacturing defects; wear, breaches of operating rules and repairs by others are usually not covered.
- Steam boiler for a workshop: which fuel and which designA boiler is chosen from the fuel you always have and from how much steam, and at what pressure, the workshop needs. Gas and liquid fuel call for a fire-tube boiler with a burner. Coal and biomass call for a boiler with a grate. Wet biomass, slag and low-grade coal call for a fluidized bed boiler.
- Boiler from China: what approvals are needed before first start-upA steam boiler in Uzbekistan is pressure equipment. Since 6 February 2026 it has been governed by a technical regulation approved by CMR Resolution No. 493. Before release to the market the boiler undergoes conformity assessment and arrives with the plant's passport and calculations; start-up and operation follow industrial safety rules.
- Passport and manual in Chinese: what to require in RussianAsk for the passport and manual before shipment, not after. A plant usually supplies them in Chinese and English. For some equipment in Uzbekistan the law requires documents in the state language, for example for boilers and other pressure equipment. A Russian translation for your own mechanics is written into the contract separately.
- Where a slate plant needs steam and how not to lose it on the wayAt a slate plant steam goes to the autoclave, to the curing chambers and, in winter, to heating water and buildings. It is lost on the way in three places: bare pipes and valves without insulation, faulty steam traps, and condensate drained into a ditch instead of returned to the boiler house.
- How much steam a slate plant needs: estimating the boilerBoiler capacity is worked out not from the floor area of the shop and not from a salesman's advice, but from the steam consumers: how much heat goes into warming the autoclave, the cars and the sheets, how much is lost through the walls and the steam line, and how often the cycles overlap. The main consumer is the heat-up: the peak rests on it. Then the boiler figure is converted from the nominal one to the actual one: it depends on the pressure and on the feedwater temperature.
Request
Send a part number or a photo — we will find the factory
Items from the catalog · 1
- TMN-STG-02 · SZL assembled steam boiler, coal and biomass