0In the list
Building of the boiler plant
Catalog item

SZL assembled steam boiler, coal and biomass

Bureau part number
TMN-STG-02

A water-tube boiler of two-drum layout; it arrives in two parts and is assembled on site — which is exactly why it is chosen where a packaged boiler no longer fits the clearance. The upper drum carries a steam separator and a header. The values were calculated for class II bituminous coal with a heating value of 5000 kcal.

Brand
Sitong
Category
Boilers
Industry
Asbestos and fiber cement · Corrugated board · Printing · Suits any industry
Availability
Made to order
Request a price

Specifications

Steam output
2–25 т/⁠ч
Working pressure
1.25 / 1.6 / 2.0 / 2.5 MPa
Efficiency
80–83 %
Fuel consumption
300–3750 кг/⁠ч
Dimensions
5.5×2.35×3.52 … 16.95×4.5×6.5 m
Boiler weight
25–120 т
How the bureau brings this item
  1. 01

    We find

    The manufacturing factory, by part number, drawing or a photo of the unit.

  2. 02

    We agree

    Price, tolerances, warranty and terms — in writing, before production.

  3. 03

    We inspect

    The lot at the factory before shipment. The report and photographs come to you.

  4. 04

    We deliver

    By air, rail or road — the route follows the value of the lot and how urgently it is needed.

  5. 05

    We coordinate

    Supervised installation and start-up are carried out by the manufacturing plant. We arrange the visit of its engineers, translation and site access.

Nearby in this category

  • 001Welding area of the boiler plant

    DZL packaged steam boiler, coal and biomass

    TMN-STG-01Sitong

  • 002Steam boiler on a trailer before shipment

    Corner-tube boiler

    TMN-STG-03Sitong

  • 003Welding area of the boiler plant

    Circulating fluidized bed boiler DHX

    TMN-STG-04Sitong

  • 004Building of the boiler plant

    WNS gas- and oil-fired steam boiler

    TMN-STG-05Sitong

Sourcing by part number

Send a part number — we will find the factory

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.