Steam boiler for a workshop: which fuel and which design

A boiler is chosen from the fuel you always have and from how much steam, and at what pressure, the workshop needs. Gas and liquid fuel call for a fire-tube boiler with a burner. Coal and biomass call for a boiler with a grate. Wet biomass, slag and low-grade coal call for a fluidized bed boiler.

Updated

Contents
  1. Fuel first
  2. What t/h and MPa mean
  3. How to read a Chinese boiler designation
  4. What to ask about water treatment
  5. What to ask about automation
  6. What the boiler passport should contain
  7. How we do it

A steam boiler is chosen in this order: first the fuel, then the amount of steam, then the pressure. The fuel is the one you have all year round at a clear price. For gas and liquid fuel, take a fire-tube boiler with a burner. For coal and dry biomass, a boiler with a grate. For wet biomass, slag and low-grade coal, a fluidized bed boiler: it burns what a grate cannot take. The amount of steam is counted in tons per hour from the workshop's consumers, the pressure by the most demanding of them.

Fuel first

The design of the boiler follows almost entirely from the fuel. A gas boiler cannot be converted to coal: they have a different furnace and a different path for the flue gases.

  • Natural gas, diesel, fuel oil. The fuel is fed by a burner. The furnace is compact, and the boiler arrives assembled. You need a gas supply or a liquid fuel store.
  • Hard coal and dry biomass. The fuel burns as a bed on a moving grate. You need a fuel store, feeding to a hopper and ash removal.
  • Wet biomass, slag, low-grade coal. The fuel burns suspended in a stream of air, in a fluidized bed. This is how burns what goes out or cakes on a grate.

Ask yourself: will you have this fuel in five years? A boiler lasts longer than one coal contract.

What t/h and MPa mean

Steam output is how much steam the boiler gives per hour, in tons. It is counted from the sum of consumers: autoclaves, drying, heating, steaming. Take it with a margin for simultaneous operation, but not double: a boiler that runs all day at low load burns fuel less efficiently.

Working pressure is the steam pressure at the outlet, in megapascals. 1 MPa is about 10 bar or 10 kgf/cm². Chinese catalogs often list the series 1.25; 1.6; 2.0; 2.5 MPa. The pressure is chosen by the consumer that needs the most, allowing for losses in the steam line.

If the pressure in the workshop's old documents is given in kgf/cm² or in bar, convert it before ordering. How to convert units from a Chinese catalog is covered in a separate article.

How to read a Chinese boiler designation

The designation of an industrial boiler usually has three parts: the type letters, the steam output and pressure, then the fuel. For example, at one manufacturer the designation DZL4-1.25-AII means a boiler of type DZL at 4 t/h and 1.25 MPa; the last code refers to the kind of coal. The rule for building designations in China is set by an industry standard on the designation of industrial boilers. Its text could not be found in open access, so the meaning of the letters below is taken from manufacturers' catalogs. Check the fuel code at the end of the designation with the plant: it depends on the edition of the standard.

DesignationWhat it isFuelWhen it is chosen
WNShorizontal fire-tube boiler with a burnergas, liquid fuelyou have gas or a liquid fuel store; a compact boiler is needed
DZLsingle-drum boiler with a chain grate, usually arrives assembledcoal, biomasssolid fuel, small and medium steam output
SZLwater-tube boiler with two drums and a chain grate, assembled on sitecoal, biomasssolid fuel, more steam needed than a packaged boiler gives
CFBboiler with a circulating fluidized bedwet biomass, slag, low-grade coalthe fuel is poor or inconsistent; large steam output

A fire-tube boiler has the hot gases inside the tubes and the water outside. A water-tube boiler is the opposite: water in the tubes, gases outside. Water-tube boilers are usually taken where more steam is needed or a packaged boiler does not fit the space: they are delivered in parts and assembled on site.

What to ask about water treatment

A boiler lives as long as its water lives. Hardness salts settle as scale on the tube walls. Scale conducts heat poorly, and the metal under it overheats.

Ask the plant:

  • what requirements it sets for feed water and boiler water and under which standard;
  • whether a water softening plant and a deaerator are included in the supply or are selected separately;
  • how and how often to blow down the boiler.

Take an analysis of the water you will feed the boiler with and attach it to the inquiry. Without the analysis, water treatment is selected blind.

What to ask about automation

  • What protections are fitted: by water level, by pressure, by flame failure for a gas boiler.
  • What the operator sees and what the event log records.
  • Whether there is remote monitoring and in which language the interface is.
  • Whose sensors, valves and controller are in the cabinet and whether they can be bought separately if one fails.

What the boiler passport should contain

In Uzbekistan a boiler is imported under the technical regulation on the safety of pressure equipment. The regulation lists what must be in the boiler passport. It is convenient to use this as a list of questions even before ordering: the design fuel and its calorific value, fuel consumption, burner type, design, working and test pressure, rated, minimum and maximum steam output, safety devices, water level indicators, automation and protection, pumps. Which approvals are needed before start-up is covered in the article on boiler approvals.

How we do it

  • We select the boiler at the manufacturing plant for your fuel, steam output and pressure. What we find, with the plant's specifications, we send before the order.
  • Where the answer must come from the plant (water treatment, automation, drum material), we ask it and pass on its word.
  • Supervised installation and start-up are led by the manufacturing plant. We arrange the visit of its engineers, interpreting and site access.

What this article relies on

Below are the documents and materials we refer to, so that you can check what is said for yourself.

Standards and documents

  • CMR Resolution No. 493 of 04.08.2025, Technical Regulation on the safety of equipment operating under excess pressure, clause 138 (boiler passport)text ↗

Reference materials

  • Oshima: catalog pages for DZL boilers and Q&A on boiler types (DZL, SZL, WNS)oshima.com.tw ↗oshima.com.tw ↗
  • taminota.com catalog: DZL, SZL, CFB, WNS boilers — descriptions by the manufacturing plant.

The decoding of letters in the designation is given from manufacturers' catalogs: the Chinese industry standard on boiler designation could not be found in open access.

Related catalog items

  • 001

    DZL packaged steam boiler, coal and biomass

    TMN-STG-01Sitong

  • 002

    SZL assembled steam boiler, coal and biomass

    TMN-STG-02Sitong

  • 003

    Circulating fluidized bed boiler DHX

    TMN-STG-04Sitong

  • 004

    WNS gas- and oil-fired steam boiler

    TMN-STG-05Sitong

Request

Send a part number or a photo — we will find the factory

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.

Up to 3 files: photos (JPG, PNG, WEBP, HEIC) or PDF, up to 15 MB in total

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.