0In the list
Outer filter mesh 80 mesh
Catalog item

Outer filter mesh 80 mesh

Bureau part number
TMN-FM-080

Outer-layer filter mesh. Cell 80 mesh — 80 openings per inch, nominal aperture about 0.18 mm. Sits behind the 40 mesh inner screen and retains the fine fraction. Selected by the mounting dimensions of the filter housing.

Category
Felts and mesh
Industry
Asbestos and fiber cement · Corrugated board · Printing · Suits any industry
Availability
From stock · Tashkent
Request a price

Specifications

Mesh size
80 mesh
How the bureau brings this item
  1. 01

    We find

    The manufacturing factory, by part number, drawing or a photo of the unit.

  2. 02

    We agree

    Price, tolerances, warranty and terms — in writing, before production.

  3. 03

    We inspect

    The lot at the factory before shipment. The report and photographs come to you.

  4. 04

    We deliver

    By air, rail or road — the route follows the value of the lot and how urgently it is needed.

  5. 05

    We coordinate

    Supervised installation and start-up are carried out by the manufacturing plant. We arrange the visit of its engineers, translation and site access.

Nearby in this category

  • 001Conveyor belt and mesh

    Synthetic fiber forming felt 97049 · 1800 g/m²

    TMN-XHB-F04Xinhuibo

  • 002Production line

    Forming felt 97248 · 1600 g/m²

    TMN-XHB-F05Xinhuibo

  • 003Forming felt 97249 · 1900 g/m²

    Forming felt 97249 · 1900 g/m²

    TMN-XHB-F06Xinhuibo

  • 004Forming felt on a line roll

    Base-backed felt for calcium silicate board 47615–47618

    TMN-XHB-F07Xinhuibo

  • 005Conveyor belt and mesh

    Spiral dryer fabric 820A · 1100 g/m²

    TMN-XHB-F08Xinhuibo

  • 006Production line

    Spiral dryer fabric 821A · 1050 g/m²

    TMN-XHB-F09Xinhuibo

Sourcing by part number

Send a part number — we will find the factory

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.