How a delivery runs
The same procedure for any batch, from a single wagon of rebar to a plate line for structural steel. Every step is closed by a document, not a promise.
- steps from specification to warehouse
- 5
- control points · mill and warehouse
- 2
- documents in the batch set
- 6
Five steps from specification to warehouse
The same procedure for any batch, from a single wagon of rebar to a plate line for structural steel.
-
Step
Specification
You send grade, sizes, standard and tonnage. We clarify tolerances, coating, length and packing exactly as the mill will record them.
- You send
- Grade, sizes, standard, tonnage and delivery city, as a list, a file or a specification assembled from the catalogue tables.
- The bureau does
- Translates the specification into the mill’s terms: tolerances, length, coating, packing, certificate type. An empty field is clarified by a question, not a guess.
- Document of the step
- A request with a TMS-Z number and the agreed specification.
-
Step
Producing mill
We select a mill that rolls this item itself rather than resells it. We agree the price to your warehouse and the contract terms.
- You send
- Answers to clarifications: the design grade, whether a GOST, GB or ASTM equivalent is acceptable, limits on length and packing.
- The bureau does
- Selects a mill that rolls this item itself, requests a mill certificate for a sample of the batch, agrees the price to your warehouse and the contract terms.
- Document of the step
- A quotation with the price to your warehouse and the contract with the producing mill.
-
Step
Mill inspection
Before shipment: thickness and diameter measurement, mill certificate checked against the heat number on the tag, marking, packing, weight. You receive a photo-documented report.
- You send
- Nothing: the inspection is part of the delivery. Optionally, a request for an independent SGS, Bureau Veritas or TÜV inspection.
- The bureau does
- An inspector at the mill before shipment: thickness and diameter measured, the heat number on the certificate checked against the tag, marking, packing, weighing, a photo of every bundle.
- Document of the step
- The photo-documented inspection report and the mill test certificate (MTC).
-
Step
Route of the batch
Wagon, container or road train, depending on tonnage and site. Customs and certification are handled by the bureau; you see where the batch is.
- You send
- Warehouse address, receiving hours, restrictions on access and unloading.
- The bureau does
- Chooses wagon, container or road train by tonnage and site, handles the customs declaration and certification in Uzbekistan, reports where the batch is.
- Document of the step
- Packing list, invoice, transport documents, certificate of origin, customs declaration.
-
Step
Acceptance at the warehouse
Checked against the specification and weighed in your presence. The second control point closes the delivery with an acceptance report.
- You send
- A representative at unloading and a scale; if there is no scale, the weight from the carrier’s documents.
- The bureau does
- Checks the batch against the specification and packing list, records the weight, draws up the acceptance report.
- Document of the step
- The acceptance report. Defects confirmed by report are replaced: the producing mill supplies the replacement under its contract with the bureau.
Two control points
The batch is checked twice: at the mill before shipment and at your warehouse on unloading. Between the two points it travels with the documents both points check against.
before shipment
Mill inspection
- Plate thickness and pipe wall — with a micrometer, at several points of every bundle
- Rebar and bar diameter — with calipers, ovality within the standard tolerance
- Mill test certificate: the heat number on the tag matches the certificate
- Marking on the steel and tags: grade, standard, mill, heat number
- Packing: strapping, edge protection, bundles at the specified weight
- Batch weighed on the mill scales, every bundle photographed
on unloading
Warehouse acceptance
- Bundle count and numbers against the packing list
- Batch weight on your scale or from the carrier’s documents
- Marking and tags against the mill certificate and the inspection report
- Condition of packing and edges after transit
- Acceptance report signed by both sides; discrepancies are recorded in it
How we ship
The batch travels by rail through Kazakhstan in wagons or containers, or by road train, depending on tonnage, dimensions and site. Large tonnage is assembled by wagon load, small tonnage by container or as part of a consolidated shipment.
Paperwork, certification in Uzbekistan and the customs declaration are handled by the bureau. The batch is visible at every node: shipment, border, arrival, warehouse.

The second point closes the delivery
The bundle is lowered onto your site, weighing and checking happen in your presence, both sides sign the acceptance report. Defects confirmed by report are replaced: the producing mill supplies the replacement under its contract with the bureau.