Documents
What arrives with the batch
Steel without papers is steel without provenance. The set is assembled at the mill and in the bureau before shipment.
-
01
Mill test certificate (MTC)
Heat number, chemical composition, mechanical properties, standard. Checked against the bundle tag at inspection.
What to check: the heat number on the tag matches the certificate; the standard and grade are those written in the contract; the EN 10204 certificate type is the one agreed before the contract. The fields are shown on the sample below.
-
02
Inspection report with photos
Measurements, marking, packing, weight, bundle numbers. Drawn up at the mill before shipment.
Measurements per bundle, bundle numbers, photographs. The bureau decides on the report whether the batch ships; you receive it before the steel leaves the mill.
-
03
Specification and packing list
Items, sizes, quantity and weight per bundle: what the warehouse acceptance is checked against.
Weight and quantity per bundle. Checked against the scale weight at acceptance; a discrepancy beyond the standard’s tolerance is recorded in the acceptance report.
-
04
Certificate of origin
Confirms the mill and country of manufacture for customs clearance.
Issued by the chamber of commerce of the country of manufacture on the exporter’s application. Required by customs; the bureau files the application and includes the document in the set.
-
05
Customs clearance
Declaration, HS codes and certification in Uzbekistan are handled by the bureau.
Declaration, HS codes and certification in Uzbekistan are handled by the bureau. Copies of the documents stay with you.
-
06
Acceptance report
Drawn up at your warehouse against the specification and scale weight. Closes the delivery.
Drawn up at your warehouse against the specification and the scale weight, signed by both sides. Defects confirmed by report are replaced: the producing mill supplies the replacement under its contract with the bureau.
Mill test certificate
| C | Si | Mn | P | S | Yield, MPa | Tensile, MPa |
|---|---|---|---|---|---|---|
| 0,__ | 0,__ | _,__ | 0,0__ | 0,0__ | ≥ 500 | ≥ 600 |
Sample
Inspection report with photos
| Item | Norm | Actual |
|---|---|---|
| Marking | GOST 34028 | ____ |
| Packing | strapping, tag | ____ |
| Weight | ___ T | ___ T |
Sample
Who issues each document and what the bureau does
| Document | Issued by | Bureau’s role |
|---|---|---|
| Mill test certificate EN 10204 3.1 | Issued byProducing mill | Bureau’s roleConfirm availability before ordering |
| Mill test certificate EN 10204 3.2 | Issued byMill plus an independent body | Bureau’s roleAgree before the contract |
| Third-party inspection | Issued bySGS, Bureau Veritas, TÜV, at the client’s option | Bureau’s roleArrange access to the mill |
| Certificate of origin | Issued byChamber of commerce | Bureau’s roleFile the application and include in the set |
| Packing list, invoice, transport documents | Issued byExporter and carrier | Bureau’s rolePrepare |
| Customs declaration and certification in Uzbekistan | Issued byThe bureau | Bureau’s roleHandle |
| Acceptance report | Issued byDrawn up at the client’s warehouse | Bureau’s roleDraw up and sign with you |
3.1 and 3.2 are not interchangeable; the type is agreed before the contract
Under EN 10204 a 3.1 certificate is issued and signed by the mill; a 3.2 certificate is signed by the mill and an independent inspection body. A project that needs 3.2 writes it into the contract: once signed, one type cannot be swapped for the other.
Replacement of defects
Defects confirmed by report are replaced: the producing mill supplies the replacement under its contract with the bureau. The basis is the acceptance report with discrepancies and photographs; the bureau pursues the replacement, and correspondence with the mill is not your concern.

The heat number on the certificate is checked against the bundle tag
A certificate whose heat number does not match is a paper about different steel. That is why the inspector checks the number before shipment, not the receiver after.