How equipment should be packed for a long journey
Packing for a long journey protects against three enemies: impact during transshipment, shifting on the way and moisture from condensation. That means a strong crate or open crating on skids, preservation of bare metal, a desiccant in sealed film, securing inside and clear marking of the packages. Wooden packaging must be treated under ISPM 15 and carry the mark.
In short
4minutes to read
7sections
4sources
In this article
Contents
Packing for a long journey protects equipment from three things: impact during transshipment, shifting on the way and moisture. From China to Central Asia the cargo passes through several climate zones and changes transport. By day the metal warms, by night it cools, and condensation forms inside a closed crate. So you need a strong crate or open crating on skids, preservation of bare metal, a desiccant in sealed film, securing of the cargo inside and clear marking of the packages. Wooden packaging for international carriage is treated under ISPM 15 and stamped with the mark. The packing requirements are written into the contract and checked by photo before shipment.
Packaging: crate, open crating, skids
- A closed crate is for electrics, control cabinets, precision units, everything that is afraid of dust and water.
- Open crating (a lattice frame) is for large steel structures that need crane access and ventilation but do not need to be fully closed.
- Skids or a pallet underneath are mandatory for a heavy package: the forks of a forklift go under them, and the package stands level on them.
A heavy unit is bolted or braced to the base of the crate, not simply placed inside. The walls of a crate do not hold a load weighing tonnes.
ISPM 15: the requirement for wooden packaging
The international standard for phytosanitary measures ISPM 15 applies to wood packaging made of raw wood: crates, pallets, crating, dunnage. Such wood is treated by an approved method (most often heat treatment) and marked with a stamp. The stamp contains the IPPC symbol, the country code, the producer code and the treatment code. Plywood, OSB and other processed materials are not covered by the standard.
Without the stamp the cargo may be held at the border, treated at the consignee's expense, or the packaging may be sent back. In the photos before shipment the stamp must be visible on every wooden package.
Preservation and protection from moisture
- Bare metal, meaning machined surfaces, shafts, mounting seats and flanges, is coated with a preservative grease or a corrosion inhibitor.
- A unit in film: it is sealed in barrier film with a desiccant (silica gel or similar) placed inside. The quantity depends on the volume and the length of the journey: the plant or the packer determines it.
- Electrics: cabinets and boards are packed separately, in film with a desiccant and with a humidity indicator, if there is one.
- Rubber, felts, screens are kept dry, without contact with oil and without the pressure of heavy crates on top.
A humidity indicator in a visible place helps at acceptance: you can see whether there was water inside.
Securing
- Inside the crate there are stops, spacers and clamps; the cargo must not shift when tilted.
- Long shafts lie in cradles, without sagging and without resting on a working surface.
- Crates in a container are lashed, with the heavy ones at the bottom; voids are filled.
- On a platform there are lashings to the standard securing points, and a tarpaulin on top.
Marking of packages
On every package, on two sides:
- the package number and the total number of packages ("3/12");
- gross and net weight, dimensions;
- the center of gravity and slinging points, for heavy packages;
- the signs "This way up", "Keep dry" and "Fragile", where needed;
- a reference to the contract or the invoice.
The package number on the crate matches the number in the packing list. Otherwise, at acceptance you cannot tell which package is missing.
What to check in the photos before shipment
- the unit in the crate before closing: secured, treated, in film, with a desiccant;
- the closed crate: intact boards, skids, marking, the ISPM 15 stamp;
- separately packed spare parts and documentation: which package they travel in;
- loading into the container or onto the platform: lashing, tarpaulin.
How we do it
- We agree the packing for transport, not for moving about a workshop.
- We look at the lot at the plant before shipment: is it the right item, the right quantity, in the right version. On small lots, when the plant ships straight to the carrier, we do not go to the plant, and we say so in advance.
- The inspection report and the photo record come to you.
What this article relies on
Below are the documents and materials we refer to, so that you can check what is said for yourself.
Standards and documents
Reference materials
- Ocean Network Express. Special Cargo Handbook 2025 (securing cargo on platforms and in open containers)kr.one-line.com ↗
- Kennedys. The importance of timing in the attachment of marine cargo cover (a dispute over insufficient packing)kennedyslaw.com ↗
The quantity of desiccant and the composition of the preservation depend on the unit and the route; they are determined by the manufacturing plant or the packer.