Five things decide the choice: volume, weight, the dimensions of the largest package, urgency and how many times the cargo will be transshipped. An urgent part goes by air or in a groupage truck, a lot of spare parts in a container or a truck, a large line in several containers and on platforms by rail. First you need a packing list with the dimensions and weight of the packages, then the choice.
In short
4minutes to read
7sections
4sources
In this article
- 01Five questions before choosing
- 02The options and when they suit
- 03An urgent part
- 04A lot of spare parts
- 05A whole line
Contents
Transport is chosen not by habit but by five features of the cargo: total volume, total weight, the dimensions and weight of the largest package, urgency and the number of transshipments on the way. An urgent part goes by air or in a groupage truck. A lot of spare parts goes in a container or a full truck. A line is shipped in several containers and on platforms, more often by rail. To choose, you need a packing list: how many packages there are, and the dimensions and weight of each. Without it any choice is a guess.
Five questions before choosing
- How many cubic meters and tonnes. Light bulky cargo runs into the volume limit, heavy compact cargo into the weight limit.
- What is the largest package. If it does not fit an ordinary container, that is already oversize cargo, a separate conversation.
- How urgent it is. Whether the line is standing because of this part or it is a stock for the season.
- How many transshipments. Each transshipment means a crane, a risk of impact and time.
- Where it is going. Whether the plant has a rail siding, an access road for a truck and a crane for unloading.
The options and when they suit
| Option | Suits | Weak points |
|---|---|---|
| Air | a light urgent part: a board, a sensor, a seal, a bearing | expensive per kilogram; limits on size and dangerous goods |
| Groupage cargo (a truck or container with other people's cargo) | a few crates, not urgent | extra transshipments at consolidation terminals; strong packing needed |
| Full truck | a lot of spare parts, crated equipment, cargo that "does not like" cranes | limit on weight and on the road clearance |
| 20 ft container | heavy compact cargo: gearboxes, pumps, metal | smaller in volume than the weight allows |
| 40 ft container, including high-cube | bulky cargo: felts, crates with units, cabinets | the weight limit is often reached before the space runs out |
| Open container, platform | tall or wide cargo | see the article on oversize cargo |
| Railcar | large lots, metal, equipment loose | loading into the railcar and unloading at the station; then a truck |
The exact internal dimensions and permitted weight of a container and a railcar are given by the carrier for the specific type: they differ by owner and by railway.
An urgent part
If the line is standing, the main question is not the cost of transport but what each day of downtime costs. A small light part goes by air. A heavier part goes in a groupage or a dedicated truck. Not only the transport speeds things up but also the readiness of the papers: the invoice, the packing list and the description for the HS code are prepared before the part leaves the plant.
A lot of spare parts
Spare parts for the season are usually put together into one shipment: one set of documents, one customs clearance, one acceptance. If the items come from different plants, you decide where to consolidate the cargo and who will check it before loading. Felts, screens and rubber are loaded so that heavy crates do not press on them and moisture does not reach them.
A whole line
A slate line is shipped not as one load but as dozens of packages: some fit into containers, some go on platforms. What matters here:
- the order of arrival: foundation parts and frames first, automation and consumables later, so they do not lie on site for months;
- a packing list by package, tied to the assembly diagram;
- identical marking on the crate, in the list and on the drawing;
- where it will be unloaded and with what: a crane, a mobile crane, a forklift.
Transshipments are the hidden price of a route
The railway from China to Central Asia changes gauge at the border, and the container is moved by crane onto a broad-gauge railcar. On mixed routes the cargo is taken off the train onto a truck and back. A truck carries from gate to gate without transshipment. For sensitive cargo, such as control cabinets, coated shafts and long thin parts, fewer transshipments often matter more than the difference in price.
How we do it
- We choose the route by the value of the lot and by how urgently it is needed: by air, by rail or by truck.
- We agree the packing for transport, not for moving about a workshop.
- The invoice, the packing list and the transport documents are prepared by us, not by you.
What this article relies on
Below are the documents and materials we refer to, so that you can check what is said for yourself.
Standards and documents
- ISO 668:2020. Series 1 freight containers — Classification, dimensions and ratings (standard card; in force with Amd 1:2022)text ↗
Reference materials
- PTC Holding / Railmarket. Dostyk terminal doubles its transshipment capacity (moving containers between 1,435 mm and 1,520 mm gauge)railmarket.com ↗
- JICA. Central Asia transport study report (Dostyk, gauge change)openjicareport.jica.go.jp ↗
- Ocean Network Express. Special Cargo Handbook 2025 (container types and their dimensions)kr.one-line.com ↗
Dimensions, weights and transit times are deliberately not given in the article: the carrier names them for the specific cargo and route.