0In the list
10Import

Registering an import contract in Uzbekistan: what and where

An import contract or invoice is entered into the electronic system of foreign trade operations, E-kontrakt, of the Customs Committee, with an electronic signature, before payment and before import. The bank pays the plant only if the data in the system match the contract, and customs checks the declaration against them. Changes are made only by a supplementary agreement, also through the system.

Updated 5 min read

In short

5minutes to read

5sections

3sources

In this article

  1. 01Who enters what into the system
  2. 02What the contract must contain
  3. 03The procedure step by step
  4. 04Amendments and errors
  5. 05How we do it
TableWho enters what into the system4 rows →

In Uzbekistan an import contract is no longer "registered at the bank" in the old way but entered into the information system of foreign trade operations, E-kontrakt, of the Customs Committee. The importer enters the information on the contract, invoices and supplementary agreements itself, in electronic form, with an electronic digital signature. Before a prepayment or the opening of a letter of credit the bank checks the payment against the data in the system, and at clearance customs checks the declaration against the contract. If the data differ, the payment and the release of the goods are delayed. The procedure is set by Cabinet of Ministers Resolution No. 283 of 14.05.2020 and the Regulation on monitoring and control of foreign trade operations attached to it; the Regulation has been amended many times, most recently in 2026.

Who enters what into the system

WhatWho enters itWhy
Foreign trade contract or invoicethe importer, a legal entity or an individual entrepreneur, a residentthe basis for payment and for customs
Supplementary agreementsthe importer, in the same way as the contractany change of terms, including the goods part
Payment informationthe importer's bankcontrol: paid means it should be imported
Declaration datacustomscontrol: imported, does it match the contract

The Regulation allows importing on the basis of an invoice, without a separate contract, and paying against such an invoice through a bank. But the invoice is also entered into the system. For equipment, where the warranty, supervised installation and acceptance matter, a full contract is still needed, for civil-law reasons and not because the system requires it.

What the contract must contain

The Regulation sets minimum requirements for a foreign trade contract (item 4). For buying equipment from China the following matters:

  • the preamble: the number, place and date, the parties and the signatories; if another person pays or receives the goods, this is stated separately;
  • the subject: the name, specifications, quantity and quality, type, model, brand; a reference to the HS code; for machines, equipment and lines, new or previously used (for used, the wear or the period of use);
  • the delivery terms under Incoterms with the exact place;
  • the delivery dates;
  • the total sum and the price per unit; if the supplier carries out installation, commissioning or training, their cost is stated separately in the contract or the specification;
  • the payment terms: currency, form, period; if the currency of payment differs from the currency of the contract, the exchange rate and its source;
  • the country of origin and the manufacturer;
  • the liability of the parties, details;
  • the language: the contract is in the state language or in another by agreement of the parties; if in another, a translation into the state language certified in the established manner.

Contracts of certain categories (strategic ones, those with state participation, funded from the budget, from foreign loans and others) also undergo expert review at the Center for Comprehensive Expertise of Projects and Import Contracts (item 13). This does not, as a rule, concern an ordinary private slate plant, but it is worth checking your own case.

The procedure step by step

  1. Agree the contract with the plant in light of the Regulation's requirements: many Chinese standard contracts do not state the manufacturer, the separate cost of supervised installation or the newness of the equipment.
  2. Enter the contract in E-kontrakt with an electronic signature (under the Regulation the entry is through the Customs Committee's system; in practice, ask your bank or broker for the current entry point).
  3. Give the bank the payment order. The bank checks the data in the system against the contract and, if there are no discrepancies, makes the prepayment or opens the letter of credit.
  4. Import and clear the goods. The customs post checks the declaration against the contract information in the system.
  5. Watch the deadline. Goods paid for under an import contract must be cleared no later than 180 days from the date of payment, or the money must be returned (item 23 of the Regulation). Currency control bodies and banks monitor this through the system (chapter 4 of the Regulation). Check the period against the current version and take it into account when you agree a prepayment and a production time with the plant.

Amendments and errors

  • The terms of the contract, including the goods part, cannot be changed without a supplementary agreement. The agreement is entered into the system in the same way as the contract (items 5, 11).
  • An error in the system data is corrected by the importer; the correction is confirmed by the bank and customs (item 11).
  • If the partner's country changes, there are separate rules on re-issuing declarations (item 5).
  • Entering incorrect data is directly named by the Regulation as a violation of the procedure for export and import operations (item 6).

How we do it

  • The invoice, the packing list and the transport documents are prepared by us, not by you.
  • We agree the price, tolerances, warranty and terms in writing, before production.
  • The payment terms are fixed in the contract: the procedure, currency and payment dates are agreed for the specific lot before the order is placed at the plant.

What this article relies on

Below are the documents and materials we refer to, so that you can check what is said for yourself.

Standards and documents

  • Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of 14.05.2020 No. 283 "On measures for further improvement of monitoring of foreign trade operations in the Republic of Uzbekistan" and the Regulation on the procedure for monitoring and control of foreign trade operations, items 1–6, 11, 13, 14, 22, 23 (latest amendments: Cabinet Resolution of 30.01.2026 No. 40, Cabinet Resolution of 05.03.2026 No. 93, Presidential Decree UP-174 of 27.08.2026; unofficial translation)text ↗
  • Resolution of the Cabinet of Ministers of the Republic of Uzbekistan of 07.09.2024 No. 551 on amendments to the Regulationtext ↗

Reference materials

  • Buxgalter.uz. What liability the importer bears for the absence of a contract number in the cargo customs declarationbuxgalter.uz ↗

Checked against the text on lex.uz on 30.10.2026. The Russian text of the Regulation on lex.uz is an unofficial translation; the official one is in the state language. Procedures change — check with your bank and a customs broker before paying and importing; the article is not a substitute for advice.

Request

Ask about your machine

A part number is enough. A drawing or a photo of the unit speeds up sourcing but is not required.

Up to 3 files: photos (JPG, PNG, WEBP, HEIC) or PDF, up to 15 MB in total

By sending the request you consent to the processing of the data provided for the purpose of replying to it, as described in the Privacy Policy.